+86-14752209050

Product

Facing the needs of the national and even global new energy product market,

Provide internal and external customers with the demand for comprehensive energy supplement of new energy commercial vehicles

Power exchange station

Eight station skid mounted power station

Jiangsu Juneng Equipment Technology Co., Ltd.'s power station is used for rapid replacement of battery packs for vehicles such as electric semi trailer tractors, electric concrete mixer trucks, and electric dump trucks. The battery exchange service is completed by using a power exchange robot to lift the battery. The power exchange station is equipped with an enclosure system, power exchange system, electronic control system, charging system, vehicle guidance system, vehicle positioning system, station control system, fire protection system, video monitoring system, sentry room, and other auxiliary systems.

Product Details

Background of project establishment:

Seize the favorable opportunity for the national launch of the "New Energy Vehicle Industry Development Plan (2021-2035)", closely follow the national strategy, accelerate the development, expansion, strength, and optimization of the new energy vehicle industry, and actively respond to and implement the central government's call for "carbon peaking, carbon neutrality"; Explore and solve customer pain points: new energy products require long energy replenishment time, low attendance, and high costs; From the perspective of the entire lifecycle and industry chain of new energy products, create new business segments and seek new economic growth points; Support the sustained and rapid development of enterprises, achieve lane changing and overtaking, promote enterprise transformation and upgrading, implement XCMG's "14th Five Year Plan", and build XCMG into a leading enterprise in new energy commercial vehicles, rapidly building a new energy vehicle industry cluster with core competitiveness and distinctive advantages.

333333.png


Main technical functional systems of the power station:

The skid mounted power station consists of the following parts: station building system, mechanical transportation system, charging system, control system, and power distribution system.


QQ截图20230825143732.png


Calculation of full load operating conditions for the eight station power station:

The battery change time for each vehicle is approximately 3.5 to 4 minutes, plus the time for entering and exiting the station and vehicle adjustment. The total battery change time for each vehicle is calculated as 5 minutes, and the fully charged battery change time is calculated as 90 minutes. The entire power station has a total of eight stations and seven batteries. After the first round of battery swapping, all batteries are fully charged and replaced after 55 minutes. It takes 35 minutes to start the second round of battery swapping, and a total of 16 rounds of battery swapping can be carried out throughout the day. That is to say, each power station can meet the maximum electricity exchange service demand of 16X7=112 vehicles throughout the day.

44444.png

Introduction to the overall plan process of the power plant replacement:

The basic power exchange process for the concentrated energy exchange station is: the vehicle is successfully identified online, then the vehicle drives to the power exchange channel, parks in place, the driver scans the code, the vehicle unlocking is completed, and the prompt for power exchange begins. The station control system drives the battery exchange robot to replace the depleted battery on the vehicle with a fully charged battery, and then the vehicle is locked, prompting that the battery exchange is complete, and the vehicle can depart.

QQ截图20230825150836.png

Advantages of energy gathering and exchange power stations:

Jiangsu Juneng Equipment Technology Co., Ltd. has multiple advantages such as better power exchange methods, more battery storage spaces, more accurate vehicle positioning, more convenient power exchange processes, more time saving, and more reliable power exchange stations.

333333---副本.png

Introduction to energy gathering and exchange power station equipment:

The Juneng Eight Station Skid Mounted Power Station Project adopts a Skid Mounted Electric Heavy Truck Automatic Charging and Changing Power Station, with a basic configuration of 1 lane and 8 battery compartments. The power station is equipped with 8 chargers ≥ 270kW, which can quickly charge the batteries. The maximum charging current of a single charger is 400A, and the charging time is about 1 hour.